About Us

Remit Hydro Limited

Remit hydro is a new concept formulated by Hydroelectricity Investment and Development Company Ltd. (HIDCL) for the development of hydropower sector in Nepal. A part of the remittance money the country is receiving will be used in the equity investment of hydropower projects. This will act as the social security vehicle for the benefit of the remit holders. The remit holders will make investment in this company in tranches to build the hydropower projects and after construction the dividend money is paid back as pension fund. It means, “Remit Hydro” is not a project per se, but is a concept. This is a concept which advocates that development of hydropower in exchange of the equity money.

Remit Hydro Limited was established in the year 2014 AD. This is a subsidiary company of Hydroelectricity Investment and Development Company Ltd. (HIDCL). HIDCL is a government company established with an objective to develop hydroelectricity in Nepal. It is a new concept which advocates that hydropower projects can be built using the remittance money and, the contributors of equity will get a return of the equity invested by them for a long period (like a pension) during the economic life of the hydropower projects. A sustainable livelihood of migrant workers is greatly linked with the sustainability of investments of their savings during their productive life.

Our Project

Ghunsa Khola HEP

Ghunsa Khola Hydroelectric Project is proposed to be developed in Lelep VDC of Taplejung District of Nepal, utilizing the flow of Ghunsa Khola, a tributary of Arun River.

Ghunsa Khola HEP

Salient Features

Hydrology

Catchment area at intake site: 726.75 km²
Design flood at intake (Q100): 880.00 m³/s
Flood at intake (Q10,000): 1442.00 m³/s

Read More

General Hydraulics

Gross head: 432.00 m
Net head: 425.55 m
Design flow Q 43: 21.28 m3/s

Read More

Power House Cavern

Type: Underground
C/l of Turbine: 1515.00 m
MIV Floor 1513.00 m

Read More